Menu
Uponor Romania
Uponor Romania
Birou Bucuresti: Splaiul Unirii 76, parter, Sector 4, Bucureşti
Birou Cluj: B-dul Brâncuși, Nr. 174, Et. 3, 400462, Cluj Napoca

Referinte

Rezultate 38
Weholite limits overflows and pollution in London

Weholite limits overflows and pollution in London

Uponor’s Weholite technology was the key solution in a unique project in London, where the Lee Tunnel and Thames Tideway tunnel have the task of capturing an average of 39 million tonnes of sewage a year from the 35 most polluting combined sewer overflows (CSOs). An upgraded pipeline system was designed to reduce the number of overflows – and their environmental impact – from the sewers and treatment systems serving London. A particular aim is to limit pollution from the sewers and treatment systems connected to the Beckton and Crossness sewage treatment works.

George Street

George Street

Uponor products set the standard for off-site construction projects by providing a quick to install, cost-effective and high performance plumbing system for the safe delivery of domestic water services for the world’s tallest modular apartment building.

Clayton Hotel

Clayton Hotel

Uponor supplies industry-leading multi-layered plumbing systems for the offsite construction of bathroom PODs for a £60m Clayton Hotel development in Manchester city centre.

West Bay

West Bay

West Bay in Bridport is a primary example of modern living. It utilises the sustainable technology of underfloor heating and flexible installation plastic pipework.

Sunesis school scheme: Sacred Heart Primary School, West Midlands

Sunesis school scheme: Sacred Heart Primary School, West Midlands

Uponor were nominated as the sole supplier for radiant heating systems for the Sunesis Schools schemes, with Main Contractor Willmott Dixon. Sunesis is a Joint Venture between Scape and Willmott Dixon, built on the combined experience of public sector know-how and private expertise. They are the market leader in delivering pre-designed buildings across a range of market sectors. Every design has a defined layout, specification, fixed cost and timescale to construct. The full benefits of a full BIM model are also utilised.